Public Works Projects

Any contractor that plans to excavate in any City of Canyon Right-of-Way must obtain a Right-of-Way Construction Permit.  

PROJECTS UNDER CONSTRUCTION:

Wastewater Collection System Rehabilitation

8” Sewer Line in 8th Ave. / 9th Ave. Alley From 16th St. to 19th St.

12” Sewer Line in 10th Ave. From 19th St. to 22nd St.

6” Force Main in 19th St. From 10th Ave. / 11th Ave. Alley to 10th Ave

   Amarillo Utility Contractors



The Public Works Department covers the following divisions:

Water Tap Application

(Must obtain permit from Planning and Development before application will be approved)

- Required for new construction that requires new water service  (tap and/or meter) or existing customers that require replacement or up-sizing of   their existing service (tap / meter, see further requirements included on form by clicking on link above)

Fire Hydrant Meter Check-Out Form

$1200.00 deposit required 

Right-of-Way Construction Permit

Any contractor that plans to excavate in any City of Canyon Right-of-Way must obtain a permit.

After Hours Emergencies

If you have an after-hours emergency, please call the Randall County Sheriff’s Office at (806) 468-5751.